← Back to search
Convertible

2017 BMW M4

Base

$38,03958,480 mi

~$670/mo est. real payment

  • Mineral White exterior paint
  • Convertible body style
  • I-6 cyl engine and automatic transmission
  • Driven 58,480 miles
See this car at Nalley Honda

Estimated real payment

$670/mo

$2,000 down · 72 mo · good credit · 6% tax. Estimate, not an offer.

Sold by

Nalley Honda

4.66,457 Google reviews

4197 Jonesboro Rd, Union City, GA 30291, USA

(770) 756-8717Directions →

Stock #NLRTHP970957

Mileage58,480 mi
DrivetrainRear-wheel Drive
EngineI-6 cyl
TransmissionAutomatic
FuelPremium Unleaded
Doors2
ExteriorMineral White
VINWBS3U9C52HP970957

About this BMW M4

2017 BMW M4 Base for sale in Union City, GA. This Mineral White convertible offers a compelling blend of performance and style, making it an excellent used BMW M4 under $40,000 near Atlanta. The vehicle features a powerful I-6 cyl engine paired with an automatic transmission and rear-wheel drive. It has been driven 58,480 miles. The exterior is in great condition, finished in Mineral White with striking black wheels that provide a bold contrast against the white paint. This M4's convertible top allows for an open-air driving experience while maintaining its sleek, sporty profile.