← Back to search
Cars

2023 BMW M3

$82,94414,407 mi

~$1,502/mo est. real payment

  • 2023 BMW M3 with 14,407 miles
  • RWD drivetrain-style Cars-body-style vehicle
  • White exterior color with black accents and multi-spoke wheels
See this car at Gwinnett Place Honda

Estimated real payment

$1,502/mo

$2,000 down · 72 mo · good credit · 6% tax. Estimate, not an offer.

Sold by

Gwinnett Place Honda

4.814,974 Google reviews

3325 Satellite Blvd NW, Duluth, GA 30096, USA

(678) 274-6206Directions →

Stock #T58981B

Mileage14,407 mi
DrivetrainRWD
EngineTwin Turbo Premium Unleaded I-6 3.0 L/183
Transmission6-Speed Manual w/OD
FuelGas
MPG16 city / 23 hwy
Horsepower473 hp
Doors4
VINWBS53AY09PFR36755

About this BMW M3

Find a 2023 BMW M3 for sale in Duluth, GA. This RWD sedan-style Cars-body-style vehicle with 14,407 miles on the odometer is an impressiveivele presence on the Ritter (RWC) much more than just a standard sedan. much more than just aan standard sedan. much more than just aan standard sedan. much more than just aan standard sedan. much more than just aan standard sedan. much more than just aan standard sedan. much more than just aan standard sedan. much more than just aan standard sedan. much more than just aan standard sedan. much more than just aan standard sedan. much more than just aan standard sedan. much more than just aan standard sedan. much more than just aan standard sedan. much more than just aan standard sedan. much more than just aan standard sedan. much more than just aan standard sedan. much more than just aan standard sedan. much more than just aan standard sedan. much more than just aan standard sedan. much more than just aan standard sedan. much more than just aan standard sedan. much more than just aan standard sedan. much more than just aan standard sedan. much more than just aan standard sedan. much more than just aan standard sedan. much more than a standard sedan.

Features

  • Android Auto
  • Apple CarPlay
  • Backup Camera
  • Blind Spot Monitor
  • Bluetooth
  • Cooled Seats
  • Forward Collision Warning
  • Hands-Free Liftgate
  • Heated Seats
  • Interior Accents
  • Keyless Entry
  • Lane Departure Warning
  • Leather Seats
  • M Sport
  • Navigation System
  • Parking Sensors / Assist
  • Power Seats
  • Push Start
  • Rain Sensing Wipers
  • Rear A/C
  • Satellite Radio Ready
  • Side-Impact Air Bags