← Back to search
Cars

2023 BMW M5

NA

$85,99525,183 mi

~$1,559/mo est. real payment

  • 2023 BMW M-Series sedan with 25,172 miles
  • Striking black exterior with gold racing stripes
  • Equipped with 4.4 Liter Twin Turbo engine and automatic transmission
  • Includes Blind Spot Monitor, Lane Departure Warning, and Forward Collision Warning
See this car at Jim Ellis Buick GMC Atlanta

Estimated real payment

$1,559/mo

$2,000 down · 72 mo · good credit · 6% tax. Estimate, not an offer.

Sold by

Jim Ellis Buick GMC Atlanta

4.32,229 Google reviews

5862 Peachtree Industrial Blvd, Norcross, GA 30071, USA

(770) 729-4976Directions →

Stock #ECC2381

Mileage25,183 mi
DrivetrainNA
Engine4.4 Liter Twin Turbo
TransmissionAutomatic
FuelGasoline Fuel
Doors4
VINWBS83CH06PCL36916

About this BMW M5

This 2023 BMW M5 for sale in Atlanta, GA, is a high-performance sedan that stands out with its striking black exterior and unique gold racing stripes. With 25,172 miles on the odometer, this well-maintained vehicle offers a powerful 4.4 Liter Twin Turbo engine paired with an automatic transmission. The interior features premium leather seats and advanced driver assistance technology, including Blind Spot Monitor, Lane Departure Warning, and Forward Collision Warning to ensure safety on every drive. This gasoline-fueled sedan is an exceptional choice for enthusiasts seeking both luxury and performance in a used BMW M5 under $90,000 near Atlanta.

Features

  • Backup Camera
  • Blind Spot Monitor
  • Bluetooth
  • Forward Collision Warning
  • Hands-Free Liftgate
  • Interior Accents
  • Keyless Entry
  • Lane Departure Warning
  • Leather Seats
  • Navigation System
  • Power Liftgate
  • Power Seats
  • Rain Sensing Wipers
  • Rear A/C
  • Satellite Radio Ready
  • Side-Impact Air Bags
  • WiFi Hotspot
  • Wireless Phone Charging