2025 BMW M5
~$1,984/mo est. real payment
- ✓2025 model year with low mileage of 11,400 miles
- ✓Powerful twin turbo gas/electric V-8 engine and AWD drivetrain
- ✓Premium interior features including leather seats and a moonroof
- ✓Advanced technology like Apple CarPlay and Android Auto
- ✓Sleek dark exterior finish and stylish wheels
Estimated real payment
$1,984/mo
$2,000 down · 72 mo · good credit · 6% tax. Estimate, not an offer.
Gwinnett Place Honda
★ 4.814,974 Google reviews
3325 Satellite Blvd NW, Duluth, GA 30096, USA
(678) 274-6206Directions →Stock #XH65972A
About this BMW M5
The 2025 BMW M5 is available for purchase in Duluth, GA. This high-performance sedan features a twin turbo gas/electric V-8 engine and an all-wheel-drive system, providing a powerful driving experience. With only 11,400 miles on the odometer, this used BMW M5 under $110,000 near Atlanta is in excellent condition with its sleek dark exterior and stylish wheels. The interior offers premium features like leather seats, heated seats, and a moonroof for added comfort. Advanced technology includes navigation, Apple CarPlay, and Android Auto for seamless connectivity. Safety features such as blind spot monitoring and lane departure warning ensure a confident ride. This M5 combines performance and luxury in one package.
Features
- • AWD
- • Android Auto
- • Apple CarPlay
- • Backup Camera
- • Blind Spot Monitor
- • Bluetooth
- • Cooled Seats
- • Hands-Free Liftgate
- • Heated Seats
- • Interior Accents
- • Keyless Entry
- • Lane Departure Warning
- • Leather Seats
- • Moonroof
- • Navigation System
- • Parking Sensors / Assist
- • Power Liftgate
- • Power Seats
- • Push Start
- • Rain Sensing Wipers
- • Rear A/C
- • Rear Heated Seats
- • Rear Sunshade
- • Satellite Radio Ready
- • Side-Impact Air Bags